IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0176 # 08 Y:1999 08 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $373 $420 Implemented
NC0176 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $89,503 $60,000 Not Implemented
NC0176 # 10 Y:1999 10 1999 ADVERTISE PRODUCT OR SERVICE $21,800 $200 Implemented
ORS003 # 01 Y:1999 01 1999 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $366,525 $729,500 Not Implemented
ORS003 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,492 $7,459 Implemented
ORS003 # 03 Y:1999 03 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $39,677 $20,000 Implemented
ORS003 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,755 $20,400 Not Implemented
ORS003 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,140 $700 Implemented
ORS003 # 06 Y:1999 06 1999 INCREASE AMOUNT OF CONDENSATE RETURNED $1,420 $2,000 Not Implemented
ORS003 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $-1,640 $4,000 Not Implemented
ORS003 # 08 Y:1999 08 1999 USE OTHER WASTE CONCENTRATION METHODS $39,020 $34,600 Implemented
ORS003 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $80,220 $15,400 Implemented
NV0134 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $5,222 $5,533 Not Implemented
NV0134 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,525 $344 Not Implemented
NV0134 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $855 $150 Implemented
NV0134 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $18,506 $0 Not Implemented
NV0134 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,801 $62,350 Not Implemented
NV0134 # 06 Y:1999 06 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $13,650 $20,000 Not Implemented
DS0149 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $319 Not Implemented
DS0149 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,856 $950 Not Implemented
DS0149 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,335 $383 Not Implemented
DS0149 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $3,933 $1,919 Not Implemented
DS0149 # 05 Y:1999 05 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $7,000 $400 Not Implemented
DS0149 # 06 Y:1999 06 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,781 $4,480 Not Implemented
DS0149 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $10,104 $3,000 Not Implemented