IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0306 # 09 Y:2004 09 2004 DEVELOP A REPAIR/REPLACE POLICY $934 $160 Implemented
WV0306 # 10 Y:2004 10 2004 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $796 $40 Implemented
WV0306 # 11 Y:2004 11 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $777 $1,060 Not Implemented
WV0306 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $696 $3,480 Implemented
WV0306 # 13 Y:2004 13 2004 INSTALL OCCUPANCY SENSORS $395 $800 Implemented
WV0306 # 14 Y:2004 14 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $318 $105 Not Implemented
OR0467 # 01 Y:2004 01 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $148,000 $50 Not Implemented
OR0467 # 02 Y:2004 02 2004 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $27,150 $252,000 Not Implemented
OR0467 # 03 Y:2004 03 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,000 $31,500 Implemented
OR0467 # 04 Y:2004 04 2004 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $46,000 $25,000 Not Implemented
OK0694 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,045,517 $1,029,484 Not Implemented
OK0694 # 02 Y:2004 02 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $60,059 $691 Not Implemented
OK0694 # 03 Y:2004 03 2004 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $9,026 $9,344 Not Implemented
OK0694 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65,085 $407,420 Not Implemented
OK0694 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,247 $2,094 Implemented
OK0694 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $2,968 Implemented
OR0466 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,000 $21,000 Implemented
OR0466 # 02 Y:2004 02 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,250 $330 Not Implemented
OR0466 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $220 $0 Not Implemented
NC0296 # 01 Y:2004 01 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $39,660 $7,500 Implemented
NC0296 # 02 Y:2004 02 2004 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $22,518 $10,000 Not Implemented
NC0296 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $11,562 $2,000 Implemented
NC0296 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,604 $7,125 Not Implemented
NC0296 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,821 $100 Implemented
NC0296 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $288 Implemented