IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0149 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,234 $116,200 Implemented
UF0149 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,019 $1,350 Implemented
UF0149 # 06 Y:1996 06 1996 BURN WASTE OIL FOR HEAT $2,278 $0 Not Implemented
UF0149 # 07 Y:1996 07 1996 ELIMINATE/REDUCE AN OPERATION $10,016 $0 Implemented
UF0147 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,558 $334 Implemented
UF0147 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $578 $0 Implemented
UF0147 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,865 $2,300 Implemented
UF0147 # 04 Y:1996 04 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,820 $450 Not Implemented
UF0147 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $500 Implemented
UF0147 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,681 $8,000 Not Implemented
UF0147 # 07 Y:1996 07 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,994 $0 Implemented
UF0146 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,979 $8,198 Implemented
UF0146 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,032 $1,050 Implemented
UF0146 # 03 Y:1996 03 1996 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $57,061 $80,000 Implemented
UF0146 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $2,637 $640 Not Implemented
UF0146 # 05 Y:1996 05 1996 REDUCE DELIVERY SCHEDULES $3,070 $0 Not Implemented
UF0146 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,410 $3,332 Implemented
UF0146 # 07 Y:1996 07 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,583 $4,715 Not Implemented
UF0145 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,729 $8,827 Not Implemented
UF0145 # 02 Y:1996 02 1996 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,843 $2,500 Implemented
UF0145 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,532 $3,500 Implemented
UF0145 # 04 Y:1996 04 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $39,624 $18,550 Not Implemented
UF0145 # 05 Y:1996 05 1996 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,868 $3,575 Implemented
UF0145 # 06 Y:1996 06 1996 TREAT AND REUSE RINSE WATERS $11,487 $40,000 Implemented
UF0144 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,468 $2,440 Implemented