Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0245 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,514 | $18,000 | Implemented |
UU0244 # 02 Y:2024 | 02 | 2024 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $3,681 | $3,450 | Not Implemented |
UU0244 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $307 | $460 | Not Implemented |
UU0244 # 03 Y:2024 | 03 | 2024 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $370 | $264 | Not Implemented |
UU0244 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,850 | $2,400 | Not Implemented |
UU0243 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,900 | $6,000 | Implemented |
UU0243 # 06 Y:2024 | 06 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,800 | $6,300 | Implemented |
UU0243 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,244 | $14,145 | Not Implemented |
UU0243 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,631 | $22,338 | Not Implemented |
UU0243 # 03 Y:2024 | 03 | 2024 | COVER OPEN TANKS | $9,190 | $7,340 | Implemented |
UU0243 # 02 Y:2024 | 02 | 2024 | USE POWER DURING OFF-PEAK PERIODS | $15,800 | $13,000 | Not Implemented |
UU0243 # 01 Y:2024 | 01 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $26,330 | $19,500 | Implemented |
UU0240 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $544 | $1,387 | Implemented |
UU0240 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $977 | $113 | Implemented |
UU0240 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,286 | $1,500 | Implemented |
UU0240 # 02 Y:2024 | 02 | 2024 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,601 | $7,755 | Implemented |
UU0240 # 01 Y:2024 | 01 | 2024 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,047 | $10,320 | Not Implemented |
UU0237 # 07 Y:2024 | 07 | 2024 | PAY UTILITY BILLS ON TIME | $210 | $150 | Implemented |
UU0237 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,040 | $375 | Not Implemented |
UU0237 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,430 | $3,000 | Implemented |
UU0237 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,350 | $8,970 | Implemented |
UU0237 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,340 | $23,500 | Implemented |
UU0237 # 02 Y:2024 | 02 | 2024 | REDUCE VENTILATION AIR | $7,109 | $28,950 | Implemented |
UU0237 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,990 | $184,280 | Implemented |
UU0239 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,011 | $3,011 | Not Implemented |