Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0245 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,514 $18,000 Implemented
UU0244 # 02 Y:2024 02 2024 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $3,681 $3,450 Not Implemented
UU0244 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $307 $460 Not Implemented
UU0244 # 03 Y:2024 03 2024 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $370 $264 Not Implemented
UU0244 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,850 $2,400 Not Implemented
UU0243 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $1,900 $6,000 Implemented
UU0243 # 06 Y:2024 06 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,800 $6,300 Implemented
UU0243 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,244 $14,145 Not Implemented
UU0243 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,631 $22,338 Not Implemented
UU0243 # 03 Y:2024 03 2024 COVER OPEN TANKS $9,190 $7,340 Implemented
UU0243 # 02 Y:2024 02 2024 USE POWER DURING OFF-PEAK PERIODS $15,800 $13,000 Not Implemented
UU0243 # 01 Y:2024 01 2024 AIR CONDITION ONLY SPACE NECESSARY $26,330 $19,500 Implemented
UU0240 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $544 $1,387 Implemented
UU0240 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $977 $113 Implemented
UU0240 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,286 $1,500 Implemented
UU0240 # 02 Y:2024 02 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $1,601 $7,755 Implemented
UU0240 # 01 Y:2024 01 2024 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,047 $10,320 Not Implemented
UU0237 # 07 Y:2024 07 2024 PAY UTILITY BILLS ON TIME $210 $150 Implemented
UU0237 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $375 Not Implemented
UU0237 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,430 $3,000 Implemented
UU0237 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $6,350 $8,970 Implemented
UU0237 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,340 $23,500 Implemented
UU0237 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $7,109 $28,950 Implemented
UU0237 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $10,990 $184,280 Implemented
UU0239 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,011 $3,011 Not Implemented