Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,150
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0202 # 10 Y:1983 | 10 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,165 | $1,800 | Not Implemented |
GT0200 # 01 Y:1983 | 01 | 1983 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $373,500 | $220,000 | Not Implemented |
KU0111 # 06 Y:1983 | 06 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $214 | $0 | Not Implemented |
KU0111 # 05 Y:1983 | 05 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $564 | $438 | Not Implemented |
KU0111 # 04 Y:1983 | 04 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $214 | $200 | Implemented |
KU0111 # 03 Y:1983 | 03 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $246 | $400 | Not Implemented |
KU0111 # 02 Y:1983 | 02 | 1983 | INSULATE BARE EQUIPMENT | $272 | $391 | Not Implemented |
KU0111 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $358 | $600 | Not Implemented |
KU0110 # 08 Y:1983 | 08 | 1983 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $162 | $0 | Not Implemented |
KU0110 # 07 Y:1983 | 07 | 1983 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $162 | $0 | Not Implemented |
KU0110 # 06 Y:1983 | 06 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $445 | $200 | Not Implemented |
KU0110 # 05 Y:1983 | 05 | 1983 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $200 | $0 | Not Implemented |
KU0110 # 04 Y:1983 | 04 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $465 | $3,000 | Implemented |
KU0110 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,606 | $4,200 | Implemented |
KU0110 # 02 Y:1983 | 02 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $1,012 | $800 | Implemented |
KU0110 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,125 | $300 | Not Implemented |
KU0109 # 04 Y:1983 | 04 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $106 | $0 | Not Implemented |
KU0109 # 03 Y:1983 | 03 | 1983 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $271 | $0 | Not Implemented |
KU0109 # 02 Y:1983 | 02 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $121 | $275 | Not Implemented |
KU0109 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $1,384 | Not Implemented |
KU0108 # 09 Y:1983 | 09 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $329 | $0 | Not Implemented |
KU0108 # 08 Y:1983 | 08 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $191 | $0 | Not Implemented |
KU0108 # 07 Y:1983 | 07 | 1983 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,840 | $52 | Implemented |
KU0108 # 06 Y:1983 | 06 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,351 | $6,314 | Implemented |
KU0108 # 05 Y:1983 | 05 | 1983 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $872 | $132 | Implemented |