Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0580 # 04 Y:1999 | 04 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $840 | $0 | Implemented |
OK0580 # 05 Y:1999 | 05 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $611 | $0 | Implemented |
ME0280 # 09 Y:1999 | 09 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $55,341 | $30,500 | Implemented |
ME0280 # 08 Y:1999 | 08 | 1999 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,092 | $1,240 | Implemented |
ME0280 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,619 | $1,000 | Not Implemented |
ME0280 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,402 | $4,940 | Implemented |
ME0280 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,204 | $1,000 | Not Implemented |
ME0280 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,958 | $28,528 | Implemented |
ME0280 # 03 Y:1999 | 03 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $15,000 | $0 | Implemented |
ME0280 # 02 Y:1999 | 02 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $105,600 | $6,000 | Implemented |
ME0280 # 01 Y:1999 | 01 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $243,000 | $20,108 | Implemented |
AR0177 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,480 | $1,214 | Not Implemented |
AR0177 # 02 Y:1999 | 02 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,452 | $6,656 | Not Implemented |
AR0177 # 03 Y:1999 | 03 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $48,768 | $92,500 | Not Implemented |
AR0177 # 04 Y:1999 | 04 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $5,480 | $8,000 | Not Implemented |
AR0177 # 05 Y:1999 | 05 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $384,000 | $400,000 | Not Implemented |
UF0238 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,479 | $7,893 | Not Implemented |
UF0238 # 02 Y:1999 | 02 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,894 | $1,361 | Implemented |
UF0238 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,287 | $0 | Implemented |
UF0238 # 04 Y:1999 | 04 | 1999 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $584 | $20 | Implemented |
UF0238 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,670 | $0 | Implemented |
UF0238 # 06 Y:1999 | 06 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,767 | $1,605 | Implemented |
UF0238 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,699 | $2,720 | Implemented |
ME0279 # 09 Y:1999 | 09 | 1999 | MINIMIZE WATER USAGE | $751 | $1,345 | Implemented |
ME0279 # 08 Y:1999 | 08 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $9,525 | $10,000 | Not Implemented |