Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0742 # 01 Y:2021 | 01 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,984 | $462,079 | Not Implemented |
CO0742 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,833 | $2,733 | Implemented |
CO0742 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $1,478 | $359 | Implemented |
CO0742 # 04 Y:2021 | 04 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,318 | $16,143 | Implemented |
CO0742 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,499 | $200 | Not Implemented |
IP0153 # 04 Y:2021 | 04 | 2021 | MAINTAIN MACHINES TO REDUCE LEAKS | $36,991 | $130,160 | Not Implemented |
IP0153 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,112 | $6,705 | Not Implemented |
IP0153 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $73 | $128 | Not Implemented |
IP0153 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,018 | $53 | Not Implemented |
WM0172 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $26,531 | $0 | Not Implemented |
WM0172 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,525 | $2,725 | Not Implemented |
WM0172 # 03 Y:2021 | 03 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,809 | $0 | Not Implemented |
WM0172 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,314 | $3,500 | Not Implemented |
WM0172 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $5,221 | Not Implemented |
WM0172 # 06 Y:2021 | 06 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,076 | $6,500 | Not Implemented |
WM0172 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,078 | $0 | Not Implemented |
WM0172 # 08 Y:2021 | 08 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $990 | $1,000 | Not Implemented |
UA0249 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,261 | $8,080 | Implemented |
UA0249 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,213 | $100 | Not Implemented |
UA0249 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $320 | $20 | Implemented |
UA0249 # 02 Y:2021 | 02 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $15,788 | $20,165 | Not Implemented |
UA0249 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,396 | $17,269 | Implemented |
CW0120 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,000 | $70,084 | Implemented |
CW0120 # 02 Y:2021 | 02 | 2021 | INSTALL BACK-UP EQUIPMENT | $32,054 | $93,000 | Implemented |
CW0120 # 03 Y:2021 | 03 | 2021 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,089 | $25,885 | Implemented |