IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3022 # 02 Y:2012 02 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $31,511 $15,063 Not Implemented
UA3022 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $12,180 $50 Not Implemented
UA3022 # 04 Y:2012 04 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $64,995 $90,750 Not Implemented
UA3020 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $35,953 $25,000 Not Implemented
UA3020 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,898 $9,195 Implemented
UA3020 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,967 $800 Not Implemented
UA3020 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $1,775 $2,010 Implemented
UA3020 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $1,260 $1,155 Not Implemented
UA3020 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,818 $879 Not Implemented
UA0084 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,489 $160 Implemented
UA0084 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,919 $640 Not Implemented
UA0084 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,106 $2,157 Implemented
UA0084 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,492 $9,195 Implemented
UA0084 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,491 $800 Not Implemented
UA0084 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $4,093 Not Implemented
UA0084 # 07 Y:2012 07 2012 PAY UTILITY BILLS ON TIME $812 $30 Implemented
UA3019 # 01 Y:2012 01 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $187,856 $297,985 Not Implemented
UA3019 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,559 $12,491 Not Implemented
UA3019 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,076 $11,695 Implemented
UA3019 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,814 $800 Implemented
UA3019 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $10,114 $16,643 Implemented
UA3019 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $31,634 $18,198 Not Implemented
UA3019 # 07 Y:2012 07 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $11,310 $10,991 Not Implemented
UA3019 # 08 Y:2012 08 2012 INSULATE BARE EQUIPMENT $2,412 $1,248 Implemented
UA3019 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $99,802 $195,000 Not Implemented