Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0514 # 07 Y:2007 | 07 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $16,800 | $11,500 | Not Implemented |
OR0514 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,700 | $0 | Implemented |
OR0514 # 09 Y:2007 | 09 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,900 | $7,400 | Not Implemented |
OR0505 # 01 Y:2006 | 01 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $18,900 | $0 | Implemented |
OR0505 # 02 Y:2006 | 02 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,600 | $0 | Implemented |
OR0505 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,000 | $0 | Not Implemented |
OR0505 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,300 | $600 | Not Implemented |
OR0505 # 05 Y:2006 | 05 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $36,760 | $2,700 | Not Implemented |
OR0505 # 06 Y:2006 | 06 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,000 | $8,000 | Not Implemented |
OR0505 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,000 | $1,000 | Not Implemented |
OR0505 # 08 Y:2006 | 08 | 2006 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $168,270 | $185,000 | Implemented |
OR0505 # 09 Y:2006 | 09 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,100 | $32,300 | Not Implemented |
OR0507 # 01 Y:2006 | 01 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,600 | $0 | Implemented |
OR0507 # 02 Y:2006 | 02 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $46,800 | $2,000 | Implemented |
OR0507 # 03 Y:2006 | 03 | 2006 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $13,600 | $3,200 | Not Implemented |
OR0507 # 04 Y:2006 | 04 | 2006 | KEEP BOILER TUBES CLEAN | $13,700 | $4,000 | Implemented |
OR0507 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,000 | $1,500 | Implemented |
OR0507 # 06 Y:2006 | 06 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $60,100 | $41,100 | Implemented |
OR0507 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,600 | $1,200 | Not Implemented |
OR0507 # 08 Y:2006 | 08 | 2006 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $32,400 | $23,200 | Not Implemented |
OR0507 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $2,100 | $2,100 | Not Implemented |
OR0507 # 10 Y:2006 | 10 | 2006 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $22,760 | $24,900 | Implemented |
OR0507 # 11 Y:2006 | 11 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,800 | $2,600 | Not Implemented |
OR0507 # 12 Y:2006 | 12 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $61,100 | $85 | Not Implemented |
OR0507 # 13 Y:2006 | 13 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,600 | $10,500 | Not Implemented |