IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0236 # 12 Y:2000 12 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $175 $500 n/a
ND0344 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,011 $600 Implemented
ND0344 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $333 $340 Implemented
ND0344 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $916 $720 Implemented
ND0344 # 04 Y:2000 04 2000 DEVELOP A REPAIR/REPLACE POLICY $2,703 $10,006 Implemented
ND0344 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,992 $900 Implemented
ND0344 # 06 Y:2000 06 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,935 $250 Implemented
ND0361 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $695 $100 Implemented
ND0361 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $6,930 Not Implemented
ND0361 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $750 Not Implemented
ND0361 # 04 Y:2000 04 2000 INCREASE EFFICIENCY OF TRUCKS $2,929 $18,500 Not Implemented
ND0361 # 05 Y:2000 05 2000 DEVELOP A REPAIR/REPLACE POLICY $4,112 $41,893 Implemented
ND0361 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,329 $400 Implemented
UM0170 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $709 $1,660 Implemented
UM0170 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,147 $500 Implemented
UM0170 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $185,532 $310,000 Not Implemented
UM0170 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $64,245 $22,000 Not Implemented
UM0170 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,573 $8,200 Not Implemented
NC0198 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,448 $300 Implemented
NC0198 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,807 $18,000 Not Implemented
NC0198 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $19,308 $41,718 Not Implemented
NC0198 # 04 Y:2000 04 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,264 $0 Implemented
NC0198 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,845 $820 Implemented
NC0198 # 06 Y:2000 06 2000 USE SOLAR HEAT TO HEAT WATER $27,142 $97,350 Not Implemented
OR0372 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $7,914 $22,000 Implemented