IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,592

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0185 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,630 $10,000 Not Implemented
DL0185 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,920 $100,000 Implemented
DL0185 # 04 Y:2020 04 2020 USE HEAT PUMP FOR SPACE CONDITIONING $12,790 $35,300 Not Implemented
DL0185 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $1,594 Implemented
DL0185 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $880 $1,036 Implemented
CL2014 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,784 $23,313 Implemented
CL2014 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $10,901 $2,295 Implemented
CL2014 # 03 Y:2020 03 2020 REPLACE TREATED WATER WITH WELL / SURFACE WATER $922 $862 Not Implemented
UD1024 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $454 $0 Not Implemented
UD1024 # 02 Y:2020 02 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $44,273 $40,000 Not Implemented
UD1024 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $37,324 $1,300 Not Implemented
UD1024 # 04 Y:2020 04 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $15,421 $0 Not Implemented
UD1024 # 05 Y:2020 05 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $921,416 $672,400 Not Implemented
UD1024 # 06 Y:2020 06 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,582 $24,500 Not Implemented
UD1024 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,282 $28,000 Not Implemented
UD1024 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,759 $10,650 Implemented
UD1024 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $40,609 $80,500 Not Implemented
UD1024 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,326 $30,000 Not Implemented
UD1024 # 11 Y:2020 11 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $636 $0 Implemented
AM0814 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $74,300 $7,400 Implemented
AM0814 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $7,570 $2,000 Implemented
AM0814 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $6,460 $9,830 Not Implemented
AM0814 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $1,000 Implemented
AM0814 # 05 Y:2020 05 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,470 $4,340 Implemented
AM0814 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $500 $25 Implemented