IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,592

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0175 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,660 $6,931 Not Implemented
UU0175 # 05 Y:2021 05 2021 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,532 $6,178 Implemented
UU0175 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,780 $7,027 Not Implemented
IC0244 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,228 $517 Implemented
IC0244 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,307 $4,150 Implemented
IC0244 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $534 Not Implemented
IC0244 # 04 Y:2020 04 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,190 $6,120 Not Implemented
IC0245 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $575 $517 Implemented
IC0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,465 $4,250 Implemented
IC0245 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $801 Implemented
IC0245 # 04 Y:2020 04 2020 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,231 $0 Implemented
IC0245 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $23,890 $13,698 Implemented
GT0951 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $79,957 $675 Implemented
GT0951 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126,097 $4,500 Implemented
GT0951 # 03 Y:2020 03 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $18,092 $2,000 Not Implemented
GT0951 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,307 $2,255 Implemented
GT0951 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,280 $66,564 Implemented
GT0951 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $21,155 $29,319 Not Implemented
GT0951 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,162 $4,561 Implemented
GT0951 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $9,097 $34,730 Not Implemented
GT0951 # 09 Y:2020 09 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $201,113 $1,989,215 Not Implemented
AS0495 # 01 Y:2020 01 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $23,643 $3,941 Implemented
AS0495 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $14,397 $249,210 Not Implemented
AS0495 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,621 $908 Implemented
AS0495 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $732 $612 Implemented