IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0801 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,877 $16,721 Implemented
UD0801 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,100 $14,833 Implemented
UD0801 # 06 Y:2009 06 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,087 $0 Not Implemented
UD0801 # 07 Y:2009 07 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $993 $45,000 Implemented
UD0801 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $62 $0 Not Implemented
AM0561 # 01 Y:2009 01 2009 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,545 $38,430 Not Implemented
AM0561 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $680 Implemented
AM0561 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $3,200 $11,050 Not Implemented
AM0561 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,440 $15 Implemented
AM0561 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $705 $300 Implemented
AM0561 # 06 Y:2009 06 2009 PAY BILLS ON TIME TO AVOID LATE FEES $452 $0 Implemented
AM0561 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,025 $535 Implemented
MA0651 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $18,774 $1,000 Not Implemented
MA0651 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,340 $96,800 Implemented
MA0651 # 03 Y:2009 03 2009 REPLACE BOILER $10,080 $30,700 Implemented
MA0651 # 04 Y:2009 04 2009 COVER OPEN TANKS $10,013 $5,866 Not Implemented
MA0651 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,941 $3,219 Not Implemented
MA0651 # 06 Y:2009 06 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,725 $18,300 Not Implemented
MZ0036 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,757 $26,855 Implemented
MZ0036 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,645 $1,500 Not Implemented
MZ0036 # 03 Y:2009 03 2009 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,267 $5,320 Not Implemented
MZ0036 # 04 Y:2009 04 2009 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,395 $8,757 Implemented
MZ0036 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $62,000 $850 Implemented
IA0441 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,701 $680 Not Implemented
IA0441 # 02 Y:2009 02 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,759 $17,051 Not Implemented