Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0801 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,877 | $16,721 | Implemented |
UD0801 # 05 Y:2009 | 05 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,100 | $14,833 | Implemented |
UD0801 # 06 Y:2009 | 06 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,087 | $0 | Not Implemented |
UD0801 # 07 Y:2009 | 07 | 2009 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $993 | $45,000 | Implemented |
UD0801 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $62 | $0 | Not Implemented |
AM0561 # 01 Y:2009 | 01 | 2009 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $13,545 | $38,430 | Not Implemented |
AM0561 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,920 | $680 | Implemented |
AM0561 # 03 Y:2009 | 03 | 2009 | OPTIMIZE PLANT POWER FACTOR | $3,200 | $11,050 | Not Implemented |
AM0561 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,440 | $15 | Implemented |
AM0561 # 05 Y:2009 | 05 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $705 | $300 | Implemented |
AM0561 # 06 Y:2009 | 06 | 2009 | PAY BILLS ON TIME TO AVOID LATE FEES | $452 | $0 | Implemented |
AM0561 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,025 | $535 | Implemented |
MA0651 # 01 Y:2009 | 01 | 2009 | REDUCE VENTILATION AIR | $18,774 | $1,000 | Not Implemented |
MA0651 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,340 | $96,800 | Implemented |
MA0651 # 03 Y:2009 | 03 | 2009 | REPLACE BOILER | $10,080 | $30,700 | Implemented |
MA0651 # 04 Y:2009 | 04 | 2009 | COVER OPEN TANKS | $10,013 | $5,866 | Not Implemented |
MA0651 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $2,941 | $3,219 | Not Implemented |
MA0651 # 06 Y:2009 | 06 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,725 | $18,300 | Not Implemented |
MZ0036 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,757 | $26,855 | Implemented |
MZ0036 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,645 | $1,500 | Not Implemented |
MZ0036 # 03 Y:2009 | 03 | 2009 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $2,267 | $5,320 | Not Implemented |
MZ0036 # 04 Y:2009 | 04 | 2009 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,395 | $8,757 | Implemented |
MZ0036 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $62,000 | $850 | Implemented |
IA0441 # 01 Y:2009 | 01 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,701 | $680 | Not Implemented |
IA0441 # 02 Y:2009 | 02 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,759 | $17,051 | Not Implemented |