IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0663 # 06 Y:2014 06 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,158 $4,500 Not Implemented
AM0663 # 07 Y:2014 07 2014 INSTALL SKYLIGHTS $915 $4,140 Not Implemented
IA0524 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,605 $3,229 Implemented
IA0524 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,592 $197 Implemented
IA0524 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $89 Implemented
IA0524 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $369 $1,010 Not Implemented
IA0524 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $297 $35 Implemented
IA0524 # 06 Y:2014 06 2014 USE OPTIMUM TEMPERATURE $660 $20 Implemented
IA0524 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $408 $110 Implemented
SF0451 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,113 $0 Implemented
SF0451 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $11,085 $0 Implemented
SF0451 # 03 Y:2014 03 2014 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $37,183 $15,000 Not Implemented
SF0451 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,957 $1,853 Implemented
SF0451 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,791 $53,490 Implemented
SF0451 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,422 $6,599 Not Implemented
SF0451 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,800 $12,734 Not Implemented
OK0893 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,552 $16,400 Implemented
OK0893 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $1,270 $1,850 Not Implemented
OK0893 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $428 $1,867 Not Implemented
OK0893 # 04 Y:2014 04 2014 INSTALL COMMON HEADER ON COMPRESSORS $1,497 $700 Implemented
OK0893 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $480 $250 Implemented
UA0127 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,119 $9,967 Not Implemented
UA0127 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,739 $6,195 Implemented
UA0127 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $1,500 Implemented
UA0127 # 04 Y:2014 04 2014 MODIFY STARTUP/SHUTDOWN TIMES $11,493 $0 Not Implemented