Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,874
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0503 # 01 Y:2002 | 01 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $51,590 | $6,250 | Implemented |
CO0503 # 02 Y:2002 | 02 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $25,940 | $0 | Implemented |
CO0503 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,053 | $0 | Not Implemented |
CO0503 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,310 | $430 | Implemented |
CO0503 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,730 | $870 | Not Implemented |
CO0503 # 06 Y:2002 | 06 | 2002 | INSTALL OCCUPANCY SENSORS | $2,760 | $3,360 | Not Implemented |
CO0503 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $498 | $946 | Implemented |
CO0503 # 08 Y:2002 | 08 | 2002 | USE PHOTOCELL CONTROLS | $2,160 | $2,040 | Not Implemented |
CO0502 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,320 | $53,800 | Not Implemented |
CO0502 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,090 | $6,200 | Not Implemented |
CO0502 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,060 | $1,050 | Implemented |
CO0502 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $830 | $0 | Not Implemented |
CO0502 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $360 | $30 | Implemented |
CO0501 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,890 | $12,000 | Not Implemented |
CO0501 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $11,610 | $1,980 | Not Implemented |
CO0501 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,180 | $10,000 | Not Implemented |
CO0501 # 04 Y:2002 | 04 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,020 | $2,000 | Not Implemented |
CO0501 # 05 Y:2002 | 05 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,440 | $2,000 | Not Implemented |
CO0501 # 06 Y:2002 | 06 | 2002 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $2,900 | $0 | Not Implemented |
CO0501 # 07 Y:2002 | 07 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $620 | $500 | Not Implemented |
CO0501 # 08 Y:2002 | 08 | 2002 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $137,140 | $300,000 | Not Implemented |
CO0501 # 09 Y:2002 | 09 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $3,230 | $6,500 | Not Implemented |
CO0500 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,000 | $7,000 | Implemented |
CO0500 # 02 Y:2002 | 02 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,990 | $300 | Implemented |
CO0500 # 03 Y:2002 | 03 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $2,640 | $5,750 | Not Implemented |