Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84,208
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0451 # 02 Y:2003 | 02 | 2003 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $14,092 | $36,000 | Not Implemented |
WI0451 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,847 | $3,433 | Not Implemented |
WI0451 # 04 Y:2003 | 04 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,486 | $500 | Not Implemented |
WI0451 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,048 | $1,280 | Not Implemented |
WI0451 # 06 Y:2003 | 06 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,005 | $1,400 | Not Implemented |
WI0451 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $754 | $294 | Not Implemented |
LE0170 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $210,423 | $300,000 | Not Implemented |
LE0170 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,647 | $7,000 | Implemented |
LE0170 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $952 | $0 | Implemented |
LE0170 # 04 Y:2003 | 04 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $367 | $0 | Implemented |
LE0170 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $440 | $560 | Not Implemented |
LE0170 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $425 | $825 | Not Implemented |
UD0679 # 01 Y:2003 | 01 | 2003 | REDUCE VENTILATION AIR | $241,706 | $-3,800,000 | n/a |
UD0679 # 02 Y:2003 | 02 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $52,385 | $1,125 | n/a |
UD0679 # 03 Y:2003 | 03 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,046 | $270 | n/a |
UD0679 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,330 | $1,100 | n/a |
UD0679 # 05 Y:2003 | 05 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,465 | $200 | n/a |
UD0679 # 06 Y:2003 | 06 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,398 | $0 | n/a |
UD0679 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,070 | $7,100 | n/a |
UD0679 # 08 Y:2003 | 08 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,200 | $1,750 | n/a |
UD0679 # 09 Y:2003 | 09 | 2003 | DISCONNECT BALLASTS | $3,797 | $132 | n/a |
UD0679 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,739 | $3,618 | n/a |
UD0679 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $232 | $110 | n/a |
BD0241 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,583 | $6,000 | Not Implemented |
BD0241 # 02 Y:2003 | 02 | 2003 | USE RADIANT HEATER FOR SPOT HEATING | $9,264 | $8,000 | Not Implemented |