IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0367 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $339 $460 Not Implemented
AS0366 # 01 Y:2004 01 2004 ADD ADDITIONAL PRODUCTION SHIFT $66,315 $18,116 Not Implemented
AS0366 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,700 $18,000 Not Implemented
AS0366 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,140 $60 Implemented
AS0366 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,660 $7,180 Not Implemented
AS0366 # 05 Y:2004 05 2004 INSTALL AN UNINTERUPTABLE POWER SUPPLY $1,275 $573 Implemented
AS0366 # 06 Y:2004 06 2004 USE SOLAR HEAT TO HEAT WATER $468 $1,730 Not Implemented
AS0366 # 07 Y:2004 07 2004 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $468 $1,150 Not Implemented
AS0366 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $1,640 Implemented
AS0365 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $790 $1,643 Implemented
AS0365 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $1,535 Implemented
AS0365 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $140 $450 Not Implemented
AS0365 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,328 $60 Implemented
AS0365 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $183 $30 Not Implemented
AS0365 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $274 $350 Implemented
AS0365 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $88,723 $78,120 Not Implemented
AS0365 # 08 Y:2003 08 2003 RECOVER AND REUSE WASTE MATERIAL $2,432 $1,059 n/a
AS0364 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,347 $7,928 Not Implemented
AS0364 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $221 $524 Not Implemented
AS0364 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $990 $150 Not Implemented
AS0364 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,291 $31,527 Not Implemented
AS0364 # 05 Y:2003 05 2003 REDUCE VENTILATION AIR $285 $10 Not Implemented
AS0362 # 01 Y:2003 01 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $577 $0 Implemented
AS0362 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $141 $450 Not Implemented
AS0362 # 03 Y:2003 03 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $922 $4,350 Implemented