Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0530 # 03 Y:2003 | 03 | 2003 | CLEAR AND RENT EXISTING SPACE | $83,099 | $162,400 | Not Implemented |
MA0530 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,234 | $30,400 | n/a |
MA0530 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,046 | $9,100 | Not Implemented |
MA0530 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,396 | $9,900 | Not Implemented |
MA0530 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,661 | $400 | Implemented |
MA0530 # 08 Y:2003 | 08 | 2003 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $8,213 | $26,700 | Not Implemented |
MA0530 # 09 Y:2003 | 09 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,271 | $2,750 | Implemented |
MA0530 # 10 Y:2003 | 10 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $692 | $1,275 | Implemented |
MA0524 # 01 Y:2002 | 01 | 2002 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $31,997 | $0 | Not Implemented |
MA0524 # 02 Y:2002 | 02 | 2002 | ADOPT IN-HOUSE MATERIAL GENERATION | $14,755 | $45,000 | Not Implemented |
MA0524 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,776 | $16,000 | n/a |
MA0524 # 04 Y:2002 | 04 | 2002 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,719 | $13,000 | n/a |
MA0524 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,117 | $2,000 | Implemented |
MA0524 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $501 | $158 | Implemented |
MA0524 # 07 Y:2002 | 07 | 2002 | INSULATE BARE EQUIPMENT | $179 | $750 | Implemented |
MA0525 # 01 Y:2002 | 01 | 2002 | AIR CONDITION ONLY SPACE NECESSARY | $10,201 | $800 | Implemented |
MA0525 # 02 Y:2002 | 02 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,687 | $5,159 | Not Implemented |
MA0525 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $791 | $0 | Implemented |
MA0525 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $582 | $200 | Implemented |
MA0525 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $425 | $596 | Implemented |
MA0525 # 06 Y:2002 | 06 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $101 | $0 | Implemented |
MA0525 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $80 | $300 | Not Implemented |
MA0522 # 01 Y:2002 | 01 | 2002 | MINIMIZE WATER USAGE | $32,733 | $25,000 | n/a |
MA0522 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $161,660 | $225,500 | Not Implemented |
MA0522 # 03 Y:2002 | 03 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $59,990 | $26,000 | n/a |