Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0376 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,012 | $6,547 | Implemented |
UM0376 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,793 | $200 | Implemented |
UM0376 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,126 | $2,000 | Implemented |
UM0376 # 07 Y:2010 | 07 | 2010 | OPTIMIZE PLANT POWER FACTOR | $2,850 | $2,850 | Implemented |
UM0376 # 08 Y:2010 | 08 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $248 | $10 | Implemented |
UM0376 # 09 Y:2010 | 09 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,943 | $2,800 | Implemented |
UM0376 # 10 Y:2010 | 10 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $582 | $6,500 | Implemented |
UM0376 # 11 Y:2010 | 11 | 2010 | HEAT WATER WITH EXHAUST HEAT | $35,366 | $24,762 | Not Implemented |
UM0374 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,667 | $200 | Not Implemented |
UM0374 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $1,765 | $2,250 | Not Implemented |
UM0374 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,227 | $6,400 | Not Implemented |
UM0374 # 04 Y:2010 | 04 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $15,389 | $33,705 | Not Implemented |
UM0374 # 05 Y:2010 | 05 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,662 | $40,550 | Not Implemented |
UM0374 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,185 | $10,900 | Implemented |
UM0374 # 07 Y:2010 | 07 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $257 | $93 | Implemented |
UM0373 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,156 | $44,196 | Not Implemented |
UM0373 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,961 | $200 | Not Implemented |
UM0373 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,127 | $4,000 | Not Implemented |
UM0373 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $870 | $828 | Not Implemented |
UM0373 # 05 Y:2010 | 05 | 2010 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,428 | $1,040 | Not Implemented |
UM0373 # 06 Y:2010 | 06 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,651 | $6,300 | Not Implemented |
UM0371 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,475 | $3,500 | Implemented |
UM0371 # 07 Y:2010 | 07 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,530 | $300,000 | Not Implemented |
UM0371 # 01 Y:2010 | 01 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $70,732 | $1,319,976 | Implemented |
UM0371 # 02 Y:2010 | 02 | 2010 | OPTIMIZE PLANT POWER FACTOR | $60,000 | $50,000 | Implemented |