IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0284 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,270 $60 Not Implemented
AS0284 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $809 $100 Implemented
AS0284 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $852 $60 Implemented
AS0284 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $315 $60 Implemented
AS0284 # 08 Y:2000 08 2000 PAY BILLS ON TIME TO AVOID LATE FEES $771 $60 Not Implemented
AS0284 # 09 Y:2000 09 2000 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $14,280 $2,240 Implemented
KU0546 # 01 Y:2000 01 2000 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $431,791 $2,400,000 Not Implemented
KU0546 # 02 Y:2000 02 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $74,779 $244,140 Not Implemented
KU0546 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $17,000 $9,570 Not Implemented
KU0546 # 04 Y:2000 04 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,500 $1,000 Implemented
KU0546 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $870 $740 Implemented
GT0698 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $7,360 $3,240 Implemented
GT0698 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $85,596 $65,000 Not Implemented
GT0698 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,389 $250 Implemented
GT0698 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $422 $192 Not Implemented
GT0698 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $108,000 $160,000 Not Implemented
GT0698 # 06 Y:2000 06 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $59,243 $300,000 Implemented
GT0698 # 07 Y:2000 07 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,235 $1,800 Implemented
GT0698 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $29,275 $55,000 Not Implemented
GT0698 # 09 Y:2000 09 2000 FILTER AND REUSE HYDRAULIC OIL $3,712 $6,200 Not Implemented
GT0698 # 10 Y:2000 10 2000 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $18,139 $77,275 Not Implemented
BD0168 # 01 Y:2000 01 2000 USE RADIANT HEATER FOR SPOT HEATING $7,663 $11,200 Implemented
BD0168 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,966 $2,169 Implemented
BD0168 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,647 $1,700 Implemented
BD0168 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $1,632 $1,650 Implemented