Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0284 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,270 | $60 | Not Implemented |
AS0284 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $809 | $100 | Implemented |
AS0284 # 06 Y:2000 | 06 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $852 | $60 | Implemented |
AS0284 # 07 Y:2000 | 07 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $315 | $60 | Implemented |
AS0284 # 08 Y:2000 | 08 | 2000 | PAY BILLS ON TIME TO AVOID LATE FEES | $771 | $60 | Not Implemented |
AS0284 # 09 Y:2000 | 09 | 2000 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $14,280 | $2,240 | Implemented |
KU0546 # 01 Y:2000 | 01 | 2000 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $431,791 | $2,400,000 | Not Implemented |
KU0546 # 02 Y:2000 | 02 | 2000 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $74,779 | $244,140 | Not Implemented |
KU0546 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $17,000 | $9,570 | Not Implemented |
KU0546 # 04 Y:2000 | 04 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,500 | $1,000 | Implemented |
KU0546 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $870 | $740 | Implemented |
GT0698 # 01 Y:2000 | 01 | 2000 | INSULATE BARE EQUIPMENT | $7,360 | $3,240 | Implemented |
GT0698 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $85,596 | $65,000 | Not Implemented |
GT0698 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,389 | $250 | Implemented |
GT0698 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $422 | $192 | Not Implemented |
GT0698 # 05 Y:2000 | 05 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $108,000 | $160,000 | Not Implemented |
GT0698 # 06 Y:2000 | 06 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $59,243 | $300,000 | Implemented |
GT0698 # 07 Y:2000 | 07 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,235 | $1,800 | Implemented |
GT0698 # 08 Y:2000 | 08 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,275 | $55,000 | Not Implemented |
GT0698 # 09 Y:2000 | 09 | 2000 | FILTER AND REUSE HYDRAULIC OIL | $3,712 | $6,200 | Not Implemented |
GT0698 # 10 Y:2000 | 10 | 2000 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $18,139 | $77,275 | Not Implemented |
BD0168 # 01 Y:2000 | 01 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $7,663 | $11,200 | Implemented |
BD0168 # 02 Y:2000 | 02 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,966 | $2,169 | Implemented |
BD0168 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,647 | $1,700 | Implemented |
BD0168 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $1,632 | $1,650 | Implemented |