IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159,045

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0246 # 03 Y:2020 03 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $492,629 $66,000 Implemented
TT0246 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $86,933 $48,800 Not Implemented
TT0246 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $65,738 $130,000 Not Implemented
TT0246 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,939 $31,200 Implemented
TT0246 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,067 $33,750 Not Implemented
TT0246 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $5,728 $12,000 Not Implemented
IC0243 # 01 Y:2020 01 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $1,582 $31,846 Not Implemented
IC0243 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $37,674 $140,751 Implemented
IC0243 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,698 $6,150 Implemented
IC0243 # 04 Y:2020 04 2020 USE OPTIMUM TEMPERATURE $24,347 $0 Not Implemented
IC0243 # 05 Y:2020 05 2020 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $21,681 $40,000 Not Implemented
IC0243 # 06 Y:2020 06 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $130,722 $713,750 Implemented
IP0141 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $298 $0 Not Implemented
IP0141 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $609 $0 Not Implemented
IP0141 # 03 Y:2020 03 2020 APPLY FOR INVESTMENT INCENTIVES $15,156 $10,000 Implemented
IP0141 # 04 Y:2020 04 2020 APPLY FOR INVESTMENT INCENTIVES $2,218 $2,000 Implemented
IP0141 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,298 $5,206 Not Implemented
UU0174 # 01 Y:2021 01 2021 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $24,060 $178,852 Implemented
UU0174 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,383 $85,347 Implemented
UU0174 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $5,107 $43,420 Not Implemented
UU0174 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $744 $200 Implemented
UU0174 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $476 $1,925 Not Implemented
AM0810 # 01 Y:2020 01 2020 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,200 $1,000 Implemented
AM0810 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,320 $1,680 Implemented
AM0810 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,410 $180 Implemented