IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,585

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0138 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,110 $4,000 Not Implemented
IP0138 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,920 $3,260 Not Implemented
IP0138 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,582 $32,713 Not Implemented
OK1029 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,568 $2,250 Implemented
OK1029 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $4,512 $0 Not Implemented
OK1029 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,684 $22,100 Implemented
OK1029 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,197 $30,672 Implemented
OK1029 # 05 Y:2020 05 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $546 $522 Not Implemented
UD1018 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 Not Implemented
UD1018 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $62,174 $26,600 Not Implemented
UD1018 # 03 Y:2020 03 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $25,124 $0 Not Implemented
UD1018 # 04 Y:2020 04 2020 REDESIGN PROCESS $43,180 $20,000 Not Implemented
UD1018 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,584 $1,500 Not Implemented
UD1018 # 06 Y:2020 06 2020 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $16,717 $64,900 Not Implemented
UD1018 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,072 $0 Not Implemented
UD1018 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $359 $392 Not Implemented
UD1018 # 09 Y:2020 09 2020 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $1,096,761 $5,000,000 Not Implemented
TT0241 # 01 Y:2020 01 2020 RECOVER WASTE HEAT FROM EQUIPMENT $116,047 $13,220 Not Implemented
TT0241 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $54,178 $300 Implemented
TT0241 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $49,818 $14,600 Implemented
TT0241 # 04 Y:2020 04 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $18,441 $75,000 Implemented
TT0241 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,106 $530 Implemented
TT0241 # 06 Y:2020 06 2020 UPGRADE CONTROLS ON COMPRESSORS $4,203 $120 Not Implemented
TT0241 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,304 $3,360 Implemented
TT0241 # 08 Y:2020 08 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,202 $20 Implemented