Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0072 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,176 | $2,039 | Implemented |
UA0072 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,742 | $3,900 | Implemented |
UA0072 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,647 | $80 | Implemented |
UA0072 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $6,856 | $7,937 | Not Implemented |
UA0072 # 05 Y:2012 | 05 | 2012 | USE PHOTOCELL CONTROLS | $1,851 | $1,030 | Not Implemented |
UA0072 # 06 Y:2012 | 06 | 2012 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $3,939 | $9,445 | Not Implemented |
UA0072 # 07 Y:2012 | 07 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,750 | $415 | Not Implemented |
UA0071 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,618 | $96,027 | Not Implemented |
UA0071 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,105 | $2,719 | Implemented |
UA0071 # 03 Y:2011 | 03 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $31,348 | $0 | Implemented |
UA0071 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,723 | $640 | Not Implemented |
UA0071 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,016 | $3,900 | Not Implemented |
UA0071 # 06 Y:2011 | 06 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,451 | $66,050 | Not Implemented |
UA0071 # 07 Y:2011 | 07 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,837 | $1,752 | Not Implemented |
UA0070 # 01 Y:2011 | 01 | 2011 | DISCONNECT BALLASTS | $47,591 | $5,500 | Not Implemented |
UA0070 # 02 Y:2011 | 02 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $549 | $845 | Not Implemented |
UA0070 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,386 | $2,900 | Not Implemented |
UA0070 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,557 | $80 | Not Implemented |
UA0070 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,086 | $15,744 | Not Implemented |
UA0069 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,023 | $800 | Not Implemented |
UA0069 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,441 | $800 | Not Implemented |
UA0069 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,126 | $1,300 | Not Implemented |
UA0069 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,916 | $3,200 | Not Implemented |
UA0069 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $678 | $2,578 | Not Implemented |
UA0069 # 06 Y:2011 | 06 | 2011 | USE OPTIMUM THICKNESS INSULATION | $25,829 | $16,900 | Not Implemented |