IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0072 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,176 $2,039 Implemented
UA0072 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,742 $3,900 Implemented
UA0072 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,647 $80 Implemented
UA0072 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $6,856 $7,937 Not Implemented
UA0072 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $1,851 $1,030 Not Implemented
UA0072 # 06 Y:2012 06 2012 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $3,939 $9,445 Not Implemented
UA0072 # 07 Y:2012 07 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,750 $415 Not Implemented
UA0071 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,618 $96,027 Not Implemented
UA0071 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,105 $2,719 Implemented
UA0071 # 03 Y:2011 03 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $31,348 $0 Implemented
UA0071 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,723 $640 Not Implemented
UA0071 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,016 $3,900 Not Implemented
UA0071 # 06 Y:2011 06 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,451 $66,050 Not Implemented
UA0071 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $22,837 $1,752 Not Implemented
UA0070 # 01 Y:2011 01 2011 DISCONNECT BALLASTS $47,591 $5,500 Not Implemented
UA0070 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $549 $845 Not Implemented
UA0070 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,386 $2,900 Not Implemented
UA0070 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,557 $80 Not Implemented
UA0070 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,086 $15,744 Not Implemented
UA0069 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $800 Not Implemented
UA0069 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,441 $800 Not Implemented
UA0069 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,126 $1,300 Not Implemented
UA0069 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,916 $3,200 Not Implemented
UA0069 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $678 $2,578 Not Implemented
UA0069 # 06 Y:2011 06 2011 USE OPTIMUM THICKNESS INSULATION $25,829 $16,900 Not Implemented