IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0143 # 06 Y:2002 06 2002 USE SYNTHETIC LUBRICANT $793 $400 Implemented
SD0305 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,294 $20,368 Not Implemented
SD0305 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,481 $10,300 Not Implemented
SD0305 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,106 $0 Not Implemented
SD0305 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $896 $1,800 Implemented
SD0305 # 05 Y:2002 05 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,100 $5,000 Not Implemented
SD0305 # 06 Y:2002 06 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,150 $0 Not Implemented
NC0244 # 01 Y:2002 01 2002 DEVELOP A REPAIR/REPLACE POLICY $2,879 $2,331 Implemented
NC0244 # 02 Y:2002 02 2002 INSTALL COMMON HEADER ON COMPRESSORS $10,649 $17,871 Not Implemented
NC0244 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,280 $1,350 Not Implemented
NC0244 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,140 $2,000 Not Implemented
NC0244 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $167 $150 Implemented
NC0244 # 06 Y:2002 06 2002 USE SOLAR HEAT TO HEAT WATER $3,554 $8,775 Not Implemented
MA0519 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,771 $13,775 Not Implemented
MA0519 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,181 $2,500 Not Implemented
MA0519 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,294 $6,675 Not Implemented
MA0519 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,344 $450 Implemented
MA0519 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,240 $500 Implemented
MI0048 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,989,000 $115,000 Implemented
MI0048 # 02 Y:2002 02 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,989,000 $7,850 Not Implemented
MI0048 # 03 Y:2002 03 2002 CLEAR AND RENT EXISTING SPACE $123,500 $300 Not Implemented
MI0048 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,814 $4,500 Not Implemented
MI0048 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $1,911 $350 Implemented
MI0048 # 06 Y:2002 06 2002 METER WASTE WATER $577 $1,454 Not Implemented
IA0297 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,367 $443 Implemented