IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0406 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $46,489 $10,000 Not Implemented
AS0406 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,210 $1,000 Not Implemented
AS0406 # 04 Y:2005 04 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $21,234 $10,000 Not Implemented
AS0406 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $20,625 $11,478 Not Implemented
AS0406 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,848 $1,000 Not Implemented
WI0497 # 01 Y:2005 01 2005 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $72,000 $85,000 Not Implemented
WI0497 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $42,415 $4,000 Not Implemented
WI0497 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,445 $86,400 Implemented
WI0497 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,421 $0 Implemented
WI0497 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,656 $500 Implemented
WI0497 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $60 Implemented
OK0714 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $1,866 $0 Not Implemented
OK0714 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,721 $117,780 Implemented
OK0714 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $4,058 $920 Implemented
OK0714 # 04 Y:2005 04 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,299 $70 Implemented
OK0714 # 05 Y:2005 05 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $10,600 $0 Implemented
OK0714 # 06 Y:2005 06 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $70,215 $3,931 Not Implemented
SU0217 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,867 $0 Implemented
SU0217 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,273 $0 Not Implemented
SU0217 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,819 $0 Implemented
SU0217 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,785 $500 Implemented
SU0217 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,763 $954 Implemented
SU0217 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,934 $652 Not Implemented
SU0217 # 07 Y:2005 07 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,167 $2,280 Implemented
SU0217 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $3,979 $14,487 Implemented