Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0518 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,756 | $4,000 | Implemented |
MA0518 # 05 Y:2002 | 05 | 2002 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,648 | $1,250 | Implemented |
MA0518 # 06 Y:2002 | 06 | 2002 | INSULATE FEEDWATER TANK | $847 | $1,000 | Implemented |
MA0516 # 01 Y:2002 | 01 | 2002 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $151,365 | $135,000 | Implemented |
MA0516 # 02 Y:2002 | 02 | 2002 | MINIMIZE WATER USAGE | $43,582 | $43,100 | Not Implemented |
MA0516 # 03 Y:2002 | 03 | 2002 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $14,155 | $19,000 | Not Implemented |
MA0516 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $5,343 | $8,400 | Implemented |
MA0516 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,745 | $460 | Implemented |
MA0516 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,589 | $5,200 | Implemented |
MA0516 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $966 | $625 | Implemented |
MA0516 # 08 Y:2002 | 08 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $560 | $0 | Not Implemented |
MA0516 # 09 Y:2002 | 09 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,704 | $15,768 | Not Implemented |
MA0511 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $38,495 | $4,090 | Implemented |
MA0511 # 02 Y:2002 | 02 | 2002 | APPLY FOR INVESTMENT INCENTIVES | $15,314 | $0 | Implemented |
MA0511 # 03 Y:2002 | 03 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,764 | $14,100 | Implemented |
MA0511 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,282 | $6,950 | Implemented |
MA0511 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $605 | $0 | Implemented |
MA0511 # 06 Y:2002 | 06 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $483 | $0 | Implemented |
MA0511 # 07 Y:2002 | 07 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $249 | $0 | Implemented |
MA0511 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $86 | $350 | Implemented |
MA0506 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,554 | $9,225 | Implemented |
MA0506 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,604 | $13,500 | Not Implemented |
MA0506 # 03 Y:2002 | 03 | 2002 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $3,778 | $0 | Not Implemented |
MA0506 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,391 | $1,102 | Implemented |
MA0506 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,289 | $1,100 | Implemented |