Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0167 # 02 Y:2020 | 02 | 2020 | TREAT AND REUSE RINSE WATERS | $72,249 | $60,000 | Implemented |
UU0167 # 03 Y:2020 | 03 | 2020 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $35,350 | $180,000 | Implemented |
UU0167 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $12,331 | $22,500 | Not Implemented |
UU0167 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,178 | $17,274 | Implemented |
UU0167 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $471,950 | $2,795,000 | Not Implemented |
WV0594 # 01 Y:2020 | 01 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $126,819 | $150,000 | Not Implemented |
WV0594 # 02 Y:2020 | 02 | 2020 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $94,912 | $539,790 | Not Implemented |
WV0594 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $54,583 | $3,500 | Implemented |
WV0594 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $46,633 | $20,450 | Implemented |
WV0594 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $18,093 | $41,800 | Implemented |
WV0594 # 06 Y:2020 | 06 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $17,638 | $2,295 | Implemented |
WV0594 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,869 | $90 | Implemented |
WV0594 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,704 | $1,950 | Implemented |
WV0594 # 09 Y:2020 | 09 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,851 | $1,500 | Implemented |
WV0594 # 10 Y:2020 | 10 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,131 | $0 | Not Implemented |
WV0594 # 11 Y:2020 | 11 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $703 | $896 | Implemented |
IC0240 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $47,834 | $36,263 | Implemented |
IC0240 # 02 Y:2020 | 02 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $260 | $444 | Implemented |
IC0240 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $30,912 | $18,940 | Implemented |
IC0240 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $16,845 | $0 | Implemented |
IC0240 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,653 | $5,000 | Implemented |
IC0240 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,057 | $4,858 | Not Implemented |
TT0239 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,455 | $1,630 | Implemented |
TT0239 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,993 | $173,628 | Implemented |
TT0239 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,285 | $11,400 | Not Implemented |