IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0391 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,552 $656 Implemented
LE0391 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $6,982 $2,372 Implemented
LE0391 # 05 Y:2015 05 2015 USE RADIANT HEATER FOR SPOT HEATING $30,168 $12,000 Not Implemented
LE0391 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,773 $1,000 Not Implemented
LE0391 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $109 $75 Implemented
LE0391 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,985 $49,800 Not Implemented
LE0391 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,081 $30,500 Not Implemented
LE0391 # 10 Y:2015 10 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $119,994 $200,000 Not Implemented
LE0391 # 11 Y:2015 11 2015 UPGRADE OBSOLETE EQUIPMENT $17,674 $30,425 Not Implemented
LE0391 # 12 Y:2015 12 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,982 $7,500 Implemented
LE0391 # 13 Y:2015 13 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,886 $29,120 Not Implemented
LE0391 # 14 Y:2015 14 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,842 $31,282 Not Implemented
LE0391 # 15 Y:2015 15 2015 OPTIMIZE PLANT POWER FACTOR $28 $145 Not Implemented
DL0144 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $112,390 $100,000 Implemented
DL0144 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN WATER LINES AND VALVES $120,650 $75,000 Implemented
DL0144 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $71,556 $20,425 Not Implemented
DL0144 # 04 Y:2015 04 2015 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $24,707 $43,805 Not Implemented
DL0144 # 05 Y:2015 05 2015 REDUCE VENTILATION AIR $17,474 $12,465 Not Implemented
DL0144 # 06 Y:2015 06 2015 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $4,116 $33,900 Not Implemented
DL0144 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,229 $126,010 Not Implemented
DL0144 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,011 $29,090 Implemented
DL0144 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,505 $14,190 Implemented
DL0144 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,820 $5,950 Implemented
DL0144 # 11 Y:2015 11 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $12,280 $44,260 Not Implemented
DL0144 # 12 Y:2015 12 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,910 $50,580 Not Implemented