IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0475 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $34,630 $100,000 Implemented
CO0475 # 07 Y:2000 07 2000 INSTALL SYSTEM TO COLLECT SCRAP $14,590 $45,000 Not Implemented
CO0475 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,520 $20,000 Not Implemented
CO0474 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,930 $10,000 Implemented
CO0474 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,680 $560 Implemented
CO0474 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,060 $2,250 Not Implemented
CO0474 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70 $0 Implemented
CO0474 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $329,200 $60,000 Implemented
CO0474 # 06 Y:2000 06 2000 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $2,400 $0 Not Implemented
CO0473 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $74,960 $1,050 Implemented
CO0473 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,150 $400 Implemented
CO0473 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,360 $10,000 Implemented
CO0473 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,980 $1,000 Implemented
CO0473 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,180 $6,780 Implemented
CO0473 # 06 Y:2000 06 2000 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,260 $500 Implemented
CO0473 # 07 Y:2000 07 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $107,610 $75,000 Implemented
CO0473 # 08 Y:2000 08 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $39,460 $10,000 Implemented
CO0473 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $587,500 $262,500 Not Implemented
CO0473 # 10 Y:2000 10 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $10,300 $26,000 Not Implemented
CO0472 # 01 Y:2000 01 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,280 $12,550 Implemented
CO0472 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,960 $200 Not Implemented
CO0472 # 03 Y:2000 03 2000 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,040 $1,000 Implemented
CO0472 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $370 Implemented
CO0472 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $410 $1,020 Implemented
CO0472 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Not Implemented