Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,874
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0475 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $34,630 | $100,000 | Implemented |
CO0475 # 07 Y:2000 | 07 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $14,590 | $45,000 | Not Implemented |
CO0475 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $6,520 | $20,000 | Not Implemented |
CO0474 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,930 | $10,000 | Implemented |
CO0474 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,680 | $560 | Implemented |
CO0474 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,060 | $2,250 | Not Implemented |
CO0474 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $70 | $0 | Implemented |
CO0474 # 05 Y:2000 | 05 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $329,200 | $60,000 | Implemented |
CO0474 # 06 Y:2000 | 06 | 2000 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $2,400 | $0 | Not Implemented |
CO0473 # 01 Y:2000 | 01 | 2000 | IMPROVE COMBUSTION CONTROL CAPABILITY | $74,960 | $1,050 | Implemented |
CO0473 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,150 | $400 | Implemented |
CO0473 # 03 Y:2000 | 03 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,360 | $10,000 | Implemented |
CO0473 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,980 | $1,000 | Implemented |
CO0473 # 05 Y:2000 | 05 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,180 | $6,780 | Implemented |
CO0473 # 06 Y:2000 | 06 | 2000 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,260 | $500 | Implemented |
CO0473 # 07 Y:2000 | 07 | 2000 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $107,610 | $75,000 | Implemented |
CO0473 # 08 Y:2000 | 08 | 2000 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $39,460 | $10,000 | Implemented |
CO0473 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $587,500 | $262,500 | Not Implemented |
CO0473 # 10 Y:2000 | 10 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $10,300 | $26,000 | Not Implemented |
CO0472 # 01 Y:2000 | 01 | 2000 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,280 | $12,550 | Implemented |
CO0472 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,960 | $200 | Not Implemented |
CO0472 # 03 Y:2000 | 03 | 2000 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,040 | $1,000 | Implemented |
CO0472 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $570 | $370 | Implemented |
CO0472 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $410 | $1,020 | Implemented |
CO0472 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $0 | Not Implemented |