Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1312 # 10 Y:2013 | 10 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $109,909 | $9,000 | Implemented |
UK1312 # 11 Y:2013 | 11 | 2013 | INSTALL REPLACEMENT DOORS | $49,300 | $270,900 | Not Implemented |
UK1312 # 12 Y:2013 | 12 | 2013 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,094 | $8,500 | Not Implemented |
UK1312 # 13 Y:2013 | 13 | 2013 | INSULATE BARE EQUIPMENT | $4,473 | $3,055 | Not Implemented |
UD0884 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $9,148 | $1,000 | Implemented |
UD0884 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,605 | $19,350 | Implemented |
UD0884 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,136 | $7,000 | Implemented |
UD0884 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,400 | $19,000 | Implemented |
UD0884 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $936 | $500 | Implemented |
UD0884 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,058 | $500 | Implemented |
UD0884 # 07 Y:2013 | 07 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,470 | $0 | Implemented |
UD0884 # 08 Y:2013 | 08 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,876 | $0 | Implemented |
UD0884 # 09 Y:2013 | 09 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,533 | $2,000 | Implemented |
UD0884 # 10 Y:2013 | 10 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,365 | $11,824 | Implemented |
UD0884 # 11 Y:2013 | 11 | 2013 | AVOID FROST FORMATION ON EVAPORATORS | $1,417 | $0 | Implemented |
UD0884 # 12 Y:2013 | 12 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,101 | $0 | Implemented |
UK1311 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,665 | $200 | Implemented |
UK1311 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,284 | $88,771 | Implemented |
UK1311 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,500 | $5,600 | Implemented |
UK1311 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,278 | $27,331 | Implemented |
UK1311 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,537 | $1,340 | Implemented |
UK1311 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $2,760 | $3,342 | Not Implemented |
UK1310 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,458 | $1,500 | Implemented |
UK1310 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,611 | $11,808 | Not Implemented |
UK1310 # 03 Y:2013 | 03 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $418 | $870 | Implemented |