Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0444 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,844 | $62,067 | Not Implemented |
NC0444 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,193 | $53,707 | Not Implemented |
NC0444 # 08 Y:2012 | 08 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,828 | $32,000 | Not Implemented |
NC0443 # 01 Y:2012 | 01 | 2012 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $24,834 | $105,200 | Not Implemented |
NC0443 # 02 Y:2012 | 02 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,610 | $27,000 | Not Implemented |
NC0443 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,514 | $500 | Not Implemented |
NC0443 # 04 Y:2012 | 04 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,960 | $10,175 | Not Implemented |
NC0443 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $633 | $2,440 | Not Implemented |
NC0443 # 06 Y:2012 | 06 | 2012 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $28,327 | $96,000 | Not Implemented |
NC0441 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,551 | $44,599 | Implemented |
NC0441 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $875 | $0 | Implemented |
NC0441 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $161 | $100 | Implemented |
NC0441 # 04 Y:2012 | 04 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $782 | $300 | Not Implemented |
NC0441 # 05 Y:2012 | 05 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,319 | $1,000 | Not Implemented |
NC0441 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,151 | $1,000 | Not Implemented |
NC0441 # 07 Y:2012 | 07 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $350 | $800 | Implemented |
NC0441 # 08 Y:2012 | 08 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $462 | $600 | Implemented |
NC0441 # 09 Y:2012 | 09 | 2012 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $1,800 | $1,000 | Not Implemented |
NC0441 # 10 Y:2012 | 10 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $1,119 | $1,000 | Implemented |
NC0441 # 11 Y:2012 | 11 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,596 | $4,760 | Implemented |
NC0441 # 12 Y:2012 | 12 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $551 | $7,310 | Implemented |
NC0441 # 13 Y:2012 | 13 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $659 | $5,880 | Implemented |
NC0441 # 14 Y:2012 | 14 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $500 | $1,980 | Implemented |
NC0441 # 15 Y:2012 | 15 | 2012 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,795 | $10,400 | Not Implemented |
NC0438 # 01 Y:2011 | 01 | 2011 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $62,448 | $94,000 | Not Implemented |