IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

157,957

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0259 # 06 Y:1988 06 1988 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $7,709 $6,300 Not Implemented
OK0260 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $0 Not Implemented
OK0260 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,473 $525 Not Implemented
OK0260 # 04 Y:1988 04 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,831 $275 Not Implemented
OK0260 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,927 $1,500 Not Implemented
OK0260 # 06 Y:1988 06 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,063 $8,400 Not Implemented
OK0260 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $822 $740 Not Implemented
OK0260 # 08 Y:1988 08 1988 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,618 $1,200 Not Implemented
OK0262 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $15,713 $3,089 Implemented
OK0262 # 02 Y:1988 02 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,723 $0 Not Implemented
OK0262 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $0 Implemented
OK0262 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,786 $0 Implemented
OK0262 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $982 $840 Implemented
OK0262 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,610 $9,800 Not Implemented
AM0037 # 01 Y:1988 01 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,390 $12,000 Implemented
AM0037 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $1,000 Implemented
AM0037 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,881 $373 Implemented
AM0037 # 04 Y:1988 04 1988 INSTALL SET-BACK TIMERS $1,280 $0 Implemented
AM0037 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $860 $740 Implemented
AM0037 # 06 Y:1988 06 1988 IMPROVE LUBRICATION PRACTICES $370 $0 Implemented
AM0037 # 07 Y:1988 07 1988 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $68 $150 Not Implemented
AM0037 # 08 Y:1988 08 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $120 $100 Implemented
AM0038 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,523 $2,737 Not Implemented
AM0038 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $372 $500 Implemented
AM0038 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $309 $0 Implemented