IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0141 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $307 $359 Implemented
UD0280 # 01 Y:1989 01 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,040 $14,400 Implemented
UD0280 # 02 Y:1989 02 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,566 $7,000 Implemented
UD0280 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,696 $0 Implemented
UD0280 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,314 $0 Implemented
UD0280 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $825 $0 Implemented
UD0280 # 06 Y:1989 06 1989 INSTALL STORM WINDOWS AND DOORS $955 $1,920 Implemented
UD0281 # 01 Y:1989 01 1989 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,368 $0 Implemented
UD0281 # 02 Y:1989 02 1989 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,430 $0 Not Implemented
UD0281 # 03 Y:1989 03 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,189 $1,500 Implemented
UD0281 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,628 $1,350 Implemented
UD0281 # 05 Y:1989 05 1989 INSTALL STORM WINDOWS AND DOORS $13,466 $14,758 Implemented
UD0282 # 01 Y:1989 01 1989 OPTIMIZE PLANT POWER FACTOR $9,760 $10,000 Not Implemented
UD0282 # 02 Y:1989 02 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,009 $500 Not Implemented
UD0282 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,389 $0 Not Implemented
UD0282 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $950 $1,500 Not Implemented
UD0282 # 05 Y:1989 05 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,435 $1,500 Not Implemented
UD0282 # 06 Y:1989 06 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,355 $1,350 Not Implemented
TN0358 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $7,348 $1,020 Implemented
TN0358 # 02 Y:1989 02 1989 USE COMPRESSOR AIR FILTERS $5,608 $100 Implemented
TN0358 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,880 $1,000 Implemented
TN0358 # 04 Y:1989 04 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,687 $2,170 Not Implemented
TN0358 # 05 Y:1989 05 1989 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,001 $0 Implemented
TN0358 # 06 Y:1989 06 1989 INSTALL SET-BACK TIMERS $1,550 $0 Implemented
TN0358 # 07 Y:1989 07 1989 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,240 $6,161 Not Implemented