IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0022 # 05 Y:1988 05 1988 AIR CONDITION ONLY SPACE NECESSARY $1,625 $2,500 Implemented
WI0022 # 06 Y:1988 06 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,127 $5,000 Not Implemented
WI0023 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $2,680 $0 Not Implemented
WI0023 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $500 Implemented
WI0023 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $259 $163 Implemented
WI0023 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $716 $500 Implemented
WI0023 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $104 $0 Implemented
OR0019 # 01 Y:1988 01 1988 OPERATE BOILERS ON HIGH FIRE SETTING $8,014 $0 Implemented
OR0019 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,700 $300 Implemented
OR0019 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $1,572 $276 Implemented
OR0019 # 05 Y:1988 05 1988 INCREASE AMOUNT OF CONDENSATE RETURNED $36,523 $9,395 Implemented
OR0019 # 06 Y:1988 06 1988 INSULATE BARE EQUIPMENT $13,283 $5,026 Implemented
OR0019 # 07 Y:1988 07 1988 INSULATE BARE EQUIPMENT $7,722 $7,598 Implemented
OR0019 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,690 $2,604 Implemented
OR0019 # 09 Y:1988 09 1988 OPTIMIZE PLANT POWER FACTOR $2,952 $6,720 Not Implemented
RU0020 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,168 $132 Implemented
RU0020 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,362 $8,250 Implemented
RU0020 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $1,062 $0 Implemented
RU0020 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,078 $500 Not Implemented
RU0021 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,128 $370 Implemented
RU0021 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $302 $0 Implemented
RU0021 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $109 $0 Not Implemented
RU0021 # 04 Y:1988 04 1988 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $956 $800 Implemented
RU0021 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,480 $2,151 Not Implemented
RU0021 # 06 Y:1988 06 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,095 $400 Implemented