IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0112 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $223 $399 Implemented
CO0113 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,170 $9,000 Not Implemented
CO0113 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $3,210 $3,000 Not Implemented
CO0113 # 03 Y:1988 03 1988 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $4,225 $4,500 Implemented
CO0113 # 04 Y:1988 04 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $311 $600 Implemented
CO0113 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $302 $0 Not Implemented
CO0113 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,920 $1,000 Implemented
CO0113 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $2,478 Not Implemented
UD0255 # 01 Y:1988 01 1988 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $7,000 $8,000 Not Implemented
UD0255 # 02 Y:1988 02 1988 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,509 $13 Not Implemented
UD0255 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,435 $2,000 Not Implemented
UD0255 # 04 Y:1988 04 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $350 $0 Implemented
WI0018 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $515 $0 Implemented
WI0018 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $258 $0 Implemented
WI0018 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,989 $4,059 Not Implemented
WI0018 # 04 Y:1988 04 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $818 $0 Implemented
WI0018 # 05 Y:1988 05 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,004 $2,800 Not Implemented
WI0019 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $1,190 $0 Not Implemented
WI0019 # 02 Y:1988 02 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $540 $0 Not Implemented
WI0019 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $926 $1,257 Not Implemented
WI0019 # 04 Y:1988 04 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,292 $0 Not Implemented
WI0019 # 05 Y:1988 05 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,248 $5,600 Not Implemented
WI0020 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $7,240 $0 Implemented
WI0020 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,253 $0 Not Implemented
WI0020 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33 $563 Implemented