Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0438 # 02 Y:2011 | 02 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,972 | $7,800 | Implemented |
NC0438 # 03 Y:2011 | 03 | 2011 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $19,068 | $32,000 | Not Implemented |
NC0438 # 04 Y:2011 | 04 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $19,936 | $5,500 | Not Implemented |
NC0438 # 05 Y:2011 | 05 | 2011 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $43,023 | $92,800 | Not Implemented |
NC0438 # 06 Y:2011 | 06 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $5,515 | $5,548 | Not Implemented |
NC0438 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,224 | $300 | Implemented |
NC0438 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $1,416 | $2,112 | Implemented |
NC0440 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $157,713 | $165,618 | Implemented |
NC0440 # 02 Y:2011 | 02 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $15,127 | $20,158 | Implemented |
NC0440 # 03 Y:2011 | 03 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,350 | $800 | Not Implemented |
NC0440 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,025 | $500 | Implemented |
NC0440 # 05 Y:2011 | 05 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,312 | $8,420 | Implemented |
NC0439 # 01 Y:2011 | 01 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $37,298 | $27,675 | Not Implemented |
NC0439 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,669 | $39,646 | Implemented |
NC0439 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $330 | $106 | Implemented |
NC0439 # 04 Y:2011 | 04 | 2011 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,390 | $4,200 | Implemented |
NC0439 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $4,934 | $2,393 | Implemented |
NC0439 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,486 | $1,800 | Not Implemented |
NC0439 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,953 | $100 | Implemented |
NC0434 # 01 Y:2011 | 01 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,138 | $2,127 | Implemented |
NC0434 # 02 Y:2011 | 02 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,152 | $14,895 | Implemented |
NC0434 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,424 | $1,000 | Implemented |
NC0434 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $142 | $100 | Implemented |
NC0434 # 05 Y:2011 | 05 | 2011 | REPLACE BOILER | $5,957 | $26,400 | Not Implemented |
NC0434 # 06 Y:2011 | 06 | 2011 | COVER OPEN TANKS | $414 | $908 | Implemented |