IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0205 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,633 $3,261 Implemented
IA0205 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $67 $100 Not Implemented
IA0205 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $950 Not Implemented
IA0205 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $211 $310 Not Implemented
IA0205 # 06 Y:1998 06 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,860 $400 Implemented
IA0205 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,680 $5,250 Implemented
IA0205 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $119,822 $290,000 Implemented
IA0205 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $42,573 $15,000 Not Implemented
IA0205 # 10 Y:1998 10 1998 ELIMINATE/REDUCE AN OPERATION $38,166 $2,000 Implemented
OR0325 # 01 Y:1998 01 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $5,486 $500 Not Implemented
OR0325 # 02 Y:1998 02 1998 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,215 $6,816 Not Implemented
OR0325 # 03 Y:1998 03 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $4,674 $0 Implemented
OR0325 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,213 $1,000 Not Implemented
OR0325 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $970 $0 Not Implemented
NV0112 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $544 $2,000 Not Implemented
NV0112 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $282 $736 Not Implemented
NV0112 # 03 Y:1998 03 1998 IMPROVE SPACE COMFORT CONDITIONING $16,667 $9,361 Not Implemented
NV0112 # 04 Y:1998 04 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $87,965 $255 Not Implemented
NV0112 # 05 Y:1998 05 1998 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $550,755 $48,000 Not Implemented
NV0112 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,277 $230 Not Implemented
NV0112 # 07 Y:1998 07 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,560 $0 Implemented
IA0204 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $8,258 $1,910 Implemented
IA0204 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,851 $500 Implemented
IA0204 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $298 $446 Not Implemented
IA0204 # 04 Y:1998 04 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,222 $566 Implemented