Select a Center

Arizona State University
Case Western Reserve University
Colorado School of Mines
Colorado State University
Indiana University-Purdue University
Kennesaw State
Lehigh University
Louisiana State University
Louisiana Tech
Michigan State University
Mississippi State
Oklahoma State University
Oregon State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of California, Irvine
University of Connecticut
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Louisville
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of North Carolina, Charlotte
University of Texas Rio Grande Valley
University of Utah
University of Washington
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
Search IAC Recommendations
Sponsored by:
EERE AMO
IAC logo
Search IAC Recommendations

147,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0114 # 01 Y:1982 01 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,834 $0 Not Implemented
GT0114 # 02 Y:1982 02 1982 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,795 $500 Not Implemented
GT0114 # 03 Y:1982 03 1982 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,049 $2,500 Not Implemented
GT0114 # 04 Y:1982 04 1982 RECOVER WASTE HEAT FROM EQUIPMENT $24,416 $48,000 Not Implemented
KU0034 # 01 Y:1982 01 1982 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,130 $6,000 Not Implemented
KU0034 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,770 $3,635 Not Implemented
KU0034 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,680 $0 Not Implemented
KU0034 # 04 Y:1982 04 1982 OPTIMIZE PLANT POWER FACTOR $1,240 $1,600 Not Implemented
KU0034 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $450 $869 Not Implemented
KU0034 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $700 Not Implemented
KU0034 # 07 Y:1982 07 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $695 $600 Not Implemented
KU0035 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,065 $36,000 Not Implemented
KU0035 # 02 Y:1982 02 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,995 $59,000 Not Implemented
KU0035 # 03 Y:1982 03 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $24,810 $0 Not Implemented
KU0035 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,265 $535 Implemented
KU0035 # 05 Y:1982 05 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $8,165 $22,000 Implemented
KU0036 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,455 $1,375 Not Implemented
KU0036 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $360 $150 Not Implemented
KU0036 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $140 Not Implemented
KU0036 # 04 Y:1982 04 1982 USE DEMAND CONTROLLER OR LOAD SHEDDER $484 $2,500 Not Implemented
KU0036 # 05 Y:1982 05 1982 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,212 $10,500 Not Implemented
KU0037 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,133 $5,362 Not Implemented
KU0037 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,075 $250 Not Implemented
KU0037 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,270 $400 Not Implemented
KU0037 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $223 $225 Not Implemented