150,657
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0143 # 05 Y:1984 | 05 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $390 | $550 | Not Implemented |
OK0143 # 06 Y:1984 | 06 | 1984 | OPTIMIZE PLANT POWER FACTOR | $600 | $1,500 | Not Implemented |
OK0145 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,260 | $3,170 | Not Implemented |
OK0145 # 02 Y:1984 | 02 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $90 | $297 | Not Implemented |
OK0145 # 03 Y:1984 | 03 | 1984 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,294 | $320 | Not Implemented |
OK0145 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $168 | $180 | Not Implemented |
OK0145 # 05 Y:1984 | 05 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $460 | $0 | Not Implemented |
OK0145 # 06 Y:1984 | 06 | 1984 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $384 | $80 | Not Implemented |
OK0145 # 07 Y:1984 | 07 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $183 | $0 | Not Implemented |
OK0145 # 08 Y:1984 | 08 | 1984 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $206 | $472 | Not Implemented |
OK0145 # 09 Y:1984 | 09 | 1984 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $9,724 | $10,340 | Not Implemented |
OK0146 # 01 Y:1984 | 01 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $142 | $525 | Not Implemented |
OK0146 # 02 Y:1984 | 02 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $176 | $450 | Not Implemented |
OK0146 # 03 Y:1984 | 03 | 1984 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $28 | $0 | Implemented |
OK0146 # 04 Y:1984 | 04 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $50 | $46 | Implemented |
OK0146 # 05 Y:1984 | 05 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $234 | $0 | Not Implemented |
OK0146 # 06 Y:1984 | 06 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,352 | $13,552 | Not Implemented |
OK0146 # 07 Y:1984 | 07 | 1984 | INSULATE BARE EQUIPMENT | $1,971 | $204 | Implemented |
UD0125 # 01 Y:1984 | 01 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,583 | $11,079 | Implemented |
UD0125 # 02 Y:1984 | 02 | 1984 | COVER OPEN TANKS | $1,611 | $1,080 | Implemented |
UD0125 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,474 | $5,156 | Implemented |
UD0126 # 01 Y:1984 | 01 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,095 | $1,000 | Implemented |
UD0126 # 02 Y:1984 | 02 | 1984 | DISCONNECT BALLASTS | $1,386 | $2,310 | Implemented |
UD0126 # 03 Y:1984 | 03 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,630 | $0 | Implemented |
UD0128 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,370 | $0 | Implemented |