Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
165,626
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0103 # 11 Y:1990 | 11 | 1990 | INSULATE BARE EQUIPMENT | $107 | $325 | Not Implemented |
WI0103 # 12 Y:1990 | 12 | 1990 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $147,710 | $600,000 | Not Implemented |
WI0104 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,116 | $137 | Implemented |
WI0104 # 02 Y:1990 | 02 | 1990 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,431 | $0 | Not Implemented |
WI0104 # 03 Y:1990 | 03 | 1990 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,037 | $14,700 | Implemented |
WI0104 # 04 Y:1990 | 04 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $373 | $473 | Implemented |
WI0104 # 05 Y:1990 | 05 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,799 | $1,000 | Implemented |
WI0104 # 06 Y:1990 | 06 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $575 | $0 | Implemented |
WI0104 # 07 Y:1990 | 07 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $792 | $250 | Not Implemented |
WI0104 # 08 Y:1990 | 08 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $100 | $0 | Implemented |
WI0104 # 09 Y:1990 | 09 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,766 | $1,600 | Not Implemented |
KU0326 # 01 Y:1990 | 01 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,883 | $450 | Implemented |
KU0326 # 02 Y:1990 | 02 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,633 | $9,000 | Not Implemented |
KU0326 # 03 Y:1990 | 03 | 1990 | INSTALL SET-BACK TIMERS | $2,295 | $520 | Not Implemented |
KU0326 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $706 | $520 | Implemented |
KU0326 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $610 | $100 | Implemented |
KU0326 # 06 Y:1990 | 06 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $317 | $100 | Implemented |
KU0326 # 07 Y:1990 | 07 | 1990 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $708 | $0 | Implemented |
KU0326 # 08 Y:1990 | 08 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $293 | $0 | Not Implemented |
KU0326 # 09 Y:1990 | 09 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49 | $30 | Not Implemented |
KU0326 # 10 Y:1990 | 10 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $138 | $0 | Implemented |
KU0327 # 01 Y:1990 | 01 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,470 | $1,250 | Implemented |
KU0327 # 02 Y:1990 | 02 | 1990 | INSULATE BARE EQUIPMENT | $5,349 | $12,000 | Implemented |
KU0327 # 03 Y:1990 | 03 | 1990 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,611 | $3,400 | Implemented |
KU0327 # 04 Y:1990 | 04 | 1990 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,567 | $987 | Not Implemented |