IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163,717

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0175 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $5,800 Not Implemented
CO0175 # 04 Y:1990 04 1990 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,950 $200 Implemented
CO0175 # 05 Y:1990 05 1990 INSTALL TIMERS AND/OR THERMOSTATS $3,320 $8,000 Implemented
CO0175 # 06 Y:1990 06 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,270 $3,500 Not Implemented
CO0175 # 07 Y:1990 07 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $500 Implemented
CO0175 # 08 Y:1990 08 1990 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $532 $400 Implemented
CO0175 # 09 Y:1990 09 1990 REDUCE VENTILATION AIR $380 $900 Not Implemented
KU0306 # 01 Y:1990 01 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $12,917 $1,500 Not Implemented
KU0306 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,435 $200 Not Implemented
KU0306 # 03 Y:1990 03 1990 OPTIMIZE PLANT POWER FACTOR $20,507 $33,600 Not Implemented
KU0306 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $1,966 Not Implemented
KU0306 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $8,748 $0 Implemented
KU0306 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,643 $4,359 Implemented
KU0306 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,326 $0 Not Implemented
KU0306 # 08 Y:1990 08 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $229 $0 Not Implemented
KU0307 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,882 $1,861 Implemented
KU0307 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $503 $0 Implemented
KU0307 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $235 $50 Not Implemented
KU0307 # 04 Y:1990 04 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $140 $0 Implemented
KU0307 # 05 Y:1990 05 1990 USE MINIMUM SAFE OVEN VENTILATION $4,979 $600 Implemented
KU0307 # 06 Y:1990 06 1990 SHUT OFF PILOTS IN STANDBY EQUIPMENT $250 $0 Implemented
KU0307 # 07 Y:1990 07 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,730 $14,000 Implemented
WI0079 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $299 $1,000 Not Implemented
WI0079 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $68 $500 Implemented
WI0079 # 08 Y:1990 08 1990 INSTALL STORM WINDOWS AND DOORS $96 $270 Implemented