IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0334 # 03 Y:1988 03 1988 INSTALL AUTOMATIC STACK DAMPER $2,502 $1,820 Implemented
TN0334 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,482 $160 Implemented
TN0334 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,239 $560 Implemented
TN0334 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $708 $240 Implemented
TN0336 # 01 Y:1988 01 1988 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $7,226 $19,980 Not Implemented
TN0336 # 02 Y:1988 02 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,139 $7,500 Implemented
TN0336 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,260 $830 Implemented
TN0336 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,494 $0 Implemented
TN0336 # 05 Y:1988 05 1988 ADJUST VENTS TO MINIMIZE ENERGY USE $890 $1,140 Implemented
TN0336 # 06 Y:1988 06 1988 IMPROVE LUBRICATION PRACTICES $795 $1,650 Not Implemented
TN0336 # 07 Y:1988 07 1988 INSULATE BARE EQUIPMENT $418 $274 Not Implemented
TN0336 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $189 $180 Implemented
UD0251 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,500 $15,000 Implemented
UD0251 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,275 $0 Implemented
UD0251 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,853 $16,000 Not Implemented
UD0251 # 04 Y:1988 04 1988 REDESIGN PROCESS $2,282 $1,500 Not Implemented
UD0251 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $882 $300 Implemented
UD0251 # 06 Y:1988 06 1988 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $311 $500 Not Implemented
UD0252 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,000 $0 Implemented
UD0252 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $638 $902 Implemented
UD0252 # 03 Y:1988 03 1988 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $508 $600 Implemented
UD0252 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,667 $9,550 Implemented
UD0252 # 05 Y:1988 05 1988 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $665 $728 Not Implemented
UD0252 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,267 $4,098 Implemented
UD0252 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $506 $1,000 Implemented