IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,585

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0243 # 10 Y:1988 10 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $454 $0 Not Implemented
KU0243 # 11 Y:1988 11 1988 USE COMPRESSOR AIR FILTERS $128 $0 Implemented
UD0255 # 01 Y:1988 01 1988 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $7,000 $8,000 Not Implemented
UD0255 # 02 Y:1988 02 1988 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,509 $13 Not Implemented
UD0255 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,435 $2,000 Not Implemented
UD0255 # 04 Y:1988 04 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $350 $0 Implemented
UD0251 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,500 $15,000 Implemented
UD0251 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,275 $0 Implemented
UD0251 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,853 $16,000 Not Implemented
UD0251 # 04 Y:1988 04 1988 REDESIGN PROCESS $2,282 $1,500 Not Implemented
UD0251 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $882 $300 Implemented
UD0251 # 06 Y:1988 06 1988 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $311 $500 Not Implemented
UD0252 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,000 $0 Implemented
UD0252 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $638 $902 Implemented
UD0252 # 03 Y:1988 03 1988 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $508 $600 Implemented
UD0252 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,667 $9,550 Implemented
UD0252 # 05 Y:1988 05 1988 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $665 $728 Not Implemented
UD0252 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,267 $4,098 Implemented
UD0252 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $506 $1,000 Implemented
UD0253 # 01 Y:1988 01 1988 REDUCE VENTILATION AIR $2,007 $900 Implemented
UD0253 # 02 Y:1988 02 1988 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $15,536 $20,000 Implemented
UD0253 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $875 $805 Implemented
UD0253 # 04 Y:1988 04 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,830 $8,000 Implemented
UD0253 # 05 Y:1988 05 1988 INSTALL STORM WINDOWS AND DOORS $804 $700 Implemented
UD0254 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,969 $45,557 Implemented