IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164,580

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0308 # 04 Y:1990 04 1990 INSTALL TURBULATORS $214 $260 Implemented
OK0308 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,258 $2,275 Implemented
OK0308 # 06 Y:1990 06 1990 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $52,043 $42,000 Not Implemented
OK0308 # 07 Y:1990 07 1990 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $8,121 $14,000 Not Implemented
OR0084 # 01 Y:1990 01 1990 INSULATE BARE EQUIPMENT $604 $278 Not Implemented
OR0084 # 02 Y:1990 02 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $461 $592 Not Implemented
OR0084 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,603 $2,563 Implemented
OR0084 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $1,837 $3,500 Implemented
OR0084 # 05 Y:1990 05 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,851 $18,000 Implemented
OR0084 # 06 Y:1990 06 1990 OPTIMIZE PLANT POWER FACTOR $3,547 $9,000 Not Implemented
RU0087 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,222 $9,000 Not Implemented
RU0087 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,858 $68 Not Implemented
RU0087 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $650 Not Implemented
RU0087 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,016 $0 Not Implemented
RU0087 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,717 $3,492 Not Implemented
RU0087 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,877 $1,200 Not Implemented
RU0087 # 07 Y:1990 07 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $626 $170 Not Implemented
RU0087 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $150 $500 Not Implemented
RU0082 # 01 Y:1990 01 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,625 $0 Not Implemented
RU0082 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,107 $72 Not Implemented
RU0082 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,184 $0 Not Implemented
RU0082 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,942 $14,350 Not Implemented
RU0082 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,747 $7,500 Not Implemented
RU0082 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,108 $500 Not Implemented
RU0083 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,358 $325 Implemented