IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0212 # 11 Y:2018 11 2018 INSTALL OCCUPANCY SENSORS $283 $250 Implemented
AM0765 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $510 $595 Implemented
AM0765 # 05 Y:2018 05 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,740 $0 Implemented
AM0765 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,210 $22 Not Implemented
AM0765 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,060 $1,000 Implemented
AM0765 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $71,530 $81,610 Implemented
AM0765 # 01 Y:2018 01 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $173,300 $721,800 Not Implemented
NL0026 # 01 Y:2018 01 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,240 $65,000 Not Implemented
NL0026 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,570 $69,390 Implemented
NL0026 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $1,000 Implemented
NL0026 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Not Implemented
UF0522 # 01 Y:2018 01 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $36,742 $240,000 Not Implemented
UF0522 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $87,600 $7,358 Not Implemented
UF0522 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $21,070 $48,000 Not Implemented
UF0522 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $10,267 $0 Implemented
UF0522 # 05 Y:2018 05 2018 INSTALL SKYLIGHTS $9,473 $48,000 Not Implemented
UF0522 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,837 $0 Implemented
UF0522 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,481 $1,413 Implemented
UF0522 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $4,644 $797 Implemented
UF0522 # 09 Y:2018 09 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,753 $688 Implemented
UF0522 # 10 Y:2018 10 2018 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $60,514 $190,580 Not Implemented
WV0567 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,472 $2,150 Not Implemented
WV0567 # 01 Y:2018 01 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,443 $23,150 Not Implemented
WV0567 # 02 Y:2018 02 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,472 $5,600 Not Implemented
WV0567 # 03 Y:2018 03 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,322 $15,000 Not Implemented