IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0481 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,380 $4,800 Not Implemented
MA0481 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,370 $7,000 Implemented
MA0481 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $1,315 Implemented
MA0481 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,400 $10,000 Not Implemented
MA0481 # 07 Y:2001 07 2001 INSULATE FEEDWATER TANK $375 $1,000 Implemented
MA0481 # 08 Y:2001 08 2001 INSULATE FEEDWATER TANK $260 $1,300 Not Implemented
MA0477 # 01 Y:2000 01 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $22,890 $2,000 Not Implemented
MA0477 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $21,290 $103,000 Not Implemented
MA0477 # 03 Y:2000 03 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,580 $21,000 Not Implemented
MA0477 # 04 Y:2000 04 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,910 $0 Not Implemented
MA0477 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,200 $11,700 Implemented
MA0477 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $410 $500 Implemented
MA0476 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $109,000 $720,000 Not Implemented
MA0476 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,750 $50,000 Not Implemented
MA0476 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,100 $24,000 Implemented
MA0476 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,130 $1,000 Implemented
MA0476 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,020 $35,000 Not Implemented
MA0476 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,840 $40,000 Not Implemented
MA0476 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,150 $5,000 Implemented
MA0476 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $7,500 Implemented
MA0476 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,790 $0 Implemented
MA0476 # 10 Y:2000 10 2000 ISOLATE HOT OR COLD EQUIPMENT $2,280 $0 Implemented
MA0476 # 11 Y:2000 11 2000 REPAIR AND ELIMINATE STEAM LEAKS $950 $500 Implemented
MA0475 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,500 $8,500 Not Implemented
MA0475 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $2,450 $5,700 Implemented