IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0356 # 08 Y:2014 08 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,264 $951 Not Implemented
SU0356 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $577 $715 Not Implemented
MA0734 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,242 $53,572 Not Implemented
MA0734 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,069 $15,975 Not Implemented
MA0734 # 03 Y:2014 03 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $2,667 $2,565 Not Implemented
MA0734 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $2,594 $2,614 Not Implemented
MA0734 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $753 $2,210 Not Implemented
MA0734 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $300 Implemented
IA0523 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,230 $125,850 Implemented
IA0523 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,013 $35 Not Implemented
IA0523 # 03 Y:2014 03 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,851 $8,742 Implemented
IA0523 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $5,334 Not Implemented
IA0523 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $540 $1,680 Implemented
IA0523 # 06 Y:2014 06 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $189 $100 Implemented
IA0522 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,915 $89,600 Implemented
IA0522 # 02 Y:2014 02 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,680 $7,327 Not Implemented
IA0522 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $1,045 Not Implemented
IA0522 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,013 $2,648 Not Implemented
IA0522 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $6,365 $525 Not Implemented
IA0522 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $35 Not Implemented
IA0522 # 07 Y:2014 07 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $524 $405 Not Implemented
UK1403 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $56,910 $52,500 Not Implemented
UK1403 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,517 $0 Not Implemented
UK1403 # 03 Y:2014 03 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,250 $0 Implemented
UK1403 # 04 Y:2014 04 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $26,100 $0 Implemented