IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0333 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $17,320 $2,724 Implemented
MI0333 # 03 Y:2018 03 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,427 $320 Implemented
MI0333 # 04 Y:2018 04 2018 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $7,399 $15,000 Implemented
MI0333 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,026 $13,843 Implemented
MI0333 # 06 Y:2018 06 2018 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $4,911 $80 Implemented
MI0333 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $2,191 $2,240 Implemented
MI0333 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $826 Implemented
TT0208 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,976 $33,750 Not Implemented
TT0208 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,000 $2,500 Not Implemented
TT0208 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,089 $400 Implemented
TT0208 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $3,716 $2,030 Not Implemented
TT0208 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,732 $2,250 Not Implemented
TT0208 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $439 $600 Not Implemented
CL1806 # 01 Y:2018 01 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $66,598 $22,500 Not Implemented
CL1806 # 02 Y:2018 02 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $45,354 $46,500 Not Implemented
CL1806 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,631 $52,880 Implemented
CL1806 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $23,451 $12,200 Not Implemented
CL1806 # 05 Y:2018 05 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $7,271 $4,700 Not Implemented
CL1806 # 06 Y:2018 06 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,909 $0 Implemented
MZ0254 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,653 $180 Implemented
MZ0254 # 02 Y:2018 02 2018 USE OPTIMUM THICKNESS INSULATION $49,702 $20,960 Implemented
MZ0254 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,434 $10,000 Implemented
MZ0254 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,856 $10,840 Implemented
MZ0254 # 05 Y:2018 05 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,499 $52,000 Implemented
MZ0254 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $384 $1,000 Implemented