IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0279 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,794 $6,252 Implemented
MZ0279 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $16,719 $14,400 Implemented
MZ0279 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $428 $1,464 Implemented
MZ0279 # 07 Y:2019 07 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $19,835 $25,600 Implemented
MZ0279 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,601 $220 Not Implemented
MZ0279 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,523 $1,080 Not Implemented
AS0476 # 01 Y:2019 01 2019 INSTALL WIND POWERED ELECTRIC GENERATOR $924,031 $7,925,140 Not Implemented
AS0476 # 02 Y:2019 02 2019 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $379,615 $78,024 Not Implemented
AS0476 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $65,373 $17,381 Not Implemented
AS0476 # 04 Y:2019 04 2019 RECOVER AND REUSE COOLING WATER $14,698 $7,484 Not Implemented
NL0034 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,764 $8,337 Implemented
NL0034 # 02 Y:2019 02 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,862 $11,390 Not Implemented
NL0034 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,679 $4,388 Not Implemented
NL0034 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $493 $0 Not Implemented
NL0034 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $248 $0 Not Implemented
NL0034 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $238 $500 Implemented
NL0034 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $275 Implemented
TT0225 # 01 Y:2019 01 2019 APPLY FOR INVESTMENT INCENTIVES $61,196 $11,500 Implemented
TT0225 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,037 $53,169 Not Implemented
TT0225 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,576 $3,500 Not Implemented
TT0225 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $3,390 Not Implemented
TT0225 # 05 Y:2019 05 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,118 $1,900 Not Implemented
LE0479 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $310 Not Implemented
LE0479 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,431 $9,000 Not Implemented
LE0479 # 03 Y:2019 03 2019 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $20,437 $22,500 Not Implemented