Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,060
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0248 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,843 | $2,961 | Implemented |
KU0248 # 07 Y:1988 | 07 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,435 | $267 | Not Implemented |
KU0248 # 08 Y:1988 | 08 | 1988 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $988 | $14 | Implemented |
KU0248 # 09 Y:1988 | 09 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $608 | $40 | Implemented |
KU0248 # 10 Y:1988 | 10 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $545 | $850 | Implemented |
KU0248 # 11 Y:1988 | 11 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $451 | $450 | Not Implemented |
KU0248 # 12 Y:1988 | 12 | 1988 | IMPROVE LUBRICATION PRACTICES | $275 | $0 | Implemented |
KU0248 # 13 Y:1988 | 13 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $176 | $0 | Implemented |
KU0244 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,442 | $9,509 | Implemented |
KU0244 # 02 Y:1988 | 02 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,665 | $0 | Implemented |
KU0244 # 03 Y:1988 | 03 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,434 | $2,355 | Not Implemented |
KU0244 # 04 Y:1988 | 04 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,359 | $2,400 | Implemented |
KU0244 # 05 Y:1988 | 05 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $404 | $125 | Implemented |
KU0244 # 06 Y:1988 | 06 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $324 | $0 | Implemented |
KU0244 # 07 Y:1988 | 07 | 1988 | INSTALL AUTOMATIC STACK DAMPER | $178 | $275 | Implemented |
KU0244 # 08 Y:1988 | 08 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $174 | $10 | Not Implemented |
KU0244 # 09 Y:1988 | 09 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $114 | $0 | Implemented |
KU0245 # 01 Y:1988 | 01 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $33,489 | $50,000 | Implemented |
KU0245 # 03 Y:1988 | 03 | 1988 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,396 | $4,000 | Implemented |
KU0245 # 04 Y:1988 | 04 | 1988 | COVER OPEN TANKS | $2,670 | $400 | Implemented |
KU0245 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $311 | $162 | Implemented |
KU0245 # 06 Y:1988 | 06 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $760 | $0 | Implemented |
KU0245 # 07 Y:1988 | 07 | 1988 | INSTALL TURBULATORS | $724 | $960 | Implemented |
KU0245 # 08 Y:1988 | 08 | 1988 | INSULATE BARE EQUIPMENT | $656 | $840 | Implemented |
KU0245 # 09 Y:1988 | 09 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $518 | $250 | Not Implemented |